Week 28 pt3 - Project Update

1 / 19
Paving Begins
2 / 19
Plantings And Cap Stones In Progress At The Terrace Entry
3 / 19
Prep Work For New Expanded Brick Pavers To Shields House
4 / 19
Replacement Of A Few Sidewalk Concrete Slabs Near The Sanctuary Entry
5 / 19
Sanding New Floor In Lund Hall
6 / 19
Sidewalk And Concrete Paver Work Continues Along The Front Entry Drop Off Area
7 / 19
Sidewalk Work And Pavers Continue At The New Driveway And Sanctuary Entry
8 / 19
Sidewalk Work At CCK Entry
9 / 19
Sloped Ramps To Terrace Continue On Both Sides Of Terrace Review Required If A Railing Will Be Needed On The East Ramp Side
10 / 19
Tackable Surfaces Being Installed In CCK
11 / 19
The Main Street Entrance Was Opened This Morning Let The People Come
12 / 19
The New Doorway Viewed From Inside
13 / 19
Toilet Room Mirrors Plumbing Trim Partitions And Accessories In Progress Today
14 / 19
Topcoat Of Paving Of The Main Parking Areas Is In Progress Today Major Parking Areas Expected To Be Complete By 082917 With The Exception Of The New Main Driveway
15 / 19
Topcoat Of Paving Of The Main Parking Areas Is In Progress Today Major Parking Areas Expected To Be Complete By 082917 With The Exception Of The New Main Driveway
16 / 19
Trimwork And Siding Continues On New Vestibule
17 / 19
View Of Millwork In The Commons
18 / 19
View Of The Closets In The Commons
19 / 19
Work Continues On Ramps Walkways And Terrace