Week 12 - Project Update

1 / 9
Aerial Veiw Of Education Building And Church
2 / 9
Demolition For New Structural Posts In Existing Entry Area Walls
3 / 9
Future Front Terrace Area
4 / 9
Headers For Framed Openings For Rooftop HVAC
5 / 9
Lund Hall Ductwork Installation
6 / 9
New Meter Pit Location
7 / 9
Oil Tank Room Lower Level
8 / 9
Preparation For NewEntrance
9 / 9
Water Main Installation To New Meter Pit