Welcome Center Terrace - Weeks 19 and 20

1 / 16
Backfill Operations In Progress On The Outside Of The New Terrace Walls
2 / 16
Compaction Of Process Stone Base Material On Terrace Area
3 / 16
Compaction Of Process Stone Base Material On Terrace Area It Anticipated The Sub Concrete Slab Will Be In Place By 630
4 / 16
Drain Set And Compacted Process Stone Ready To Receive Concrete Sub Base On Friday 63017
5 / 16
Initial Masonry Veneer Installation On Terrace Walls
6 / 16
Moving Dirt Into Welcome Center Terrace
7 / 16
Slabs Are To Be Filled And Compacted In Lifts In Preparation For Sub Slab For Stone Work
8 / 16
Slabs Are To Be Filled And Compacted In Lifts In Preparation For Sub Slab For Stone Work 2
9 / 16
Spreading The Dirt Around The Welcome Center Terrace
10 / 16
Stone And Mortar Materials For Terrace Walls On Site
11 / 16
Stripping of Terrace Forms Commenced Over The Weekend And Continues This Week Stone Work Will Commence Later This Week
12 / 16
Terrace Wall Masonry Work Continues
13 / 16
View From Interior Side Stone Veneer Work Is In Progress On The Entry Terrace Drainage System Visiable
14 / 16
Welcome Center Terrace
15 / 16
Men At Work On Welcome Center Terrace
16 / 16
Opening In Terrace Wall For Ramp And Four Steps Up To Entrance Of Welcome Center